SR Supply Planner SDA
What we will achieve together :
1. Planning
· MPS (Master Production Schedule)
o Get inputs on the plan (Forecast, Opening stock, and Production Achievement)
o Run the inputs to get the final plan numbers.
· RCCP (Rough Cut Capacity Plan)
o Check capacity available to achieve the required plan (number of working days, number of workers, and number of machines)
· MRP (Material Requirement Plan)
o Run MRP to determine the needed material to achieve the production plan
o Inputs of MRP:
o Production Plan
o Opening Stock
o incoming orders
2. POs
· Place POs for needed material (local and import)
3. Actualization Report
· Make actualization report to determine achievement percentage, missed qty, and failure root cause.
4. Follow up
· Follow Up on incoming shipments (Local and Export) with the logistics team and make sure that delivery dates meet the required production plan
· Follow up production plan with production teams to make sure that the plan is achieved daily and solve any sudden issues instantly
· Follow-up updates occurred on BOM with the industrial team and make sure that real consumption meets with recorded consumption on the system
· Follow-up price updates with the sourcing team to be considered in purchase orders.
Bring your competencies :
Bachelor’s degree in engineering
Over 5 years’ Experience
Planning skill
Critical thinking
Communication
Analytical skill
Detail Oriented
Organization
Excellent knowledge of MS Office.
Excellent Knowledge of ERP systems